Monday, September 8, 2008
Saturday, August 23, 2008
Sunday, August 17, 2008
Tuesday, June 17, 2008
UT4 Final Model Image 5
Donatella: Detail and Travel (circulation around the global)
Materials and light are used to detail the different spaces through which the clients travels and takes in varies different creative experiences. The elevator rotates throughout its journey, providing different views of the surrounding areas.
Materials and light are used to detail the different spaces through which the clients travels and takes in varies different creative experiences. The elevator rotates throughout its journey, providing different views of the surrounding areas.
UT4 Final Model Image 3
Zhang: Effort and Recycling (continuous circulation of something)
Long walks and short elevators rides forces the client on the slow tedious journey to the top. The floors become thinner and shorter as they raise up, same as the elevator boxes, all which appear to fit inside each other. Is the space itself being recycled or are the people inside?
UT4 Final Model Image 2
Thursday, May 29, 2008
Trick - Creating a moving elevator
Both start at the same keynum0. When you stand on tag 1, both tag 1 and 2 move to the keynum1. Tag 1 then continues to keynum2 leaving tag 2 at keynum1. (calculated timing can then return them in the same sequence to keynum0)
NB: Mover tags can be whatever you choose
Tag 1 Mover Properties settings:
Events: (naming this tag is oppitional as it is NOT an event for another mover)
MoverEvents: Opening Event-Tag 2 (When you stand on tag 1, tag 2 moves making it the event)
Object: StandOpenTimed (because you stand on this move to start the event)
Tag 2 Mover Properties settings:
Events: Tag 2 (it is necessary to name this tag as it is an event for another mover)
MoverEvents: (it is not necessary to set this as it is not a trigger for another mover, IT IS the trigged mover)
Object: TriggerOpen Timed (because it is triggered by the movement of tag1)
More boxes can be added to the sequence however they also need to be named tag 2 so that they will all be triggered by tag 1.
Saturday, May 24, 2008
Tip
A really easy thing to do in helping organising the blogging is to create drafts of all the posts you know you'll have to do and add a couple spare posts in between for the extra stuff we may be asked to do. Any extra posts at the end can then be deleted.
Subscribe to:
Posts (Atom)